KDI Blog Lastest happenings and insights from KDI

Tales From the Field: Almost ready for opening

Last week was detail finishing for the reconstruction of site one’s shade structure that is finally done and ready for the school opening. Site one is in the process also for the new water line and security lights installation. The site two is still missing some small finishing before opening. I designed the shelf and bench for the kiosk that deals with costumers of the toilets and showers and also sells the water to community. Meanwhile we are trying to have fun and slowly by slowly moving things forward. This week we are even expanding our working area to a fourth site, that I will come back with more news about it next week.

-Ele

Leave a Reply

Your email address will not be published. Required fields are marked *

Contact

mail@kounkuey.org

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 37 other subscribers

Archives